Skip to content
Start Your Quest
Uncategorized

Your group, as the main stakeholder of the proposed development project at 18 Patterson Street, Carnegie, has been provided with the preliminary town-planning drawings prepared by the architect. Additional

adminQuest 4 min read

Project Overview

Your group, as the main stakeholder of the proposed development project at 18 Patterson Street, Carnegie, has been provided with the preliminary town-planning drawings prepared by the architect.
Additionally, the survey plan of the existing building has been provided.

Assignment Requirements

Your group is required to prepare a comprehensive report addressing the following components:

1. Evaluation of Town-Planning Drawings and Building Classification (10%)

  • Evaluate the provided town-planning drawings for the proposed development.
  • Determine the building class in accordance with the National Construction Code (NCC).
  • If multiple building types exist, list each building and its corresponding classification.

2. Evaluation of Footing Systems (25%)

  • Using the proposed levels in the town-planning drawings and the survey plan of the existing property, evaluate various footing systems discussed in Lecture Week 8.
  • Discuss the applicability, suitability, and feasibility of each footing system for the proposed development.
  • Justify your choice with relevant engineering and soil condition considerations.

3. Selection and Evaluation of Wall Type (25%)

  • Identify and discuss the wall type you intend to use in this project.
  • Provide a comparative analysis of your selected wall type against other available wall types.
  • Clearly explain the reasons for your selection, including factors such as:
    • Structural performance
    • Thermal efficiency
    • Acoustic performance
    • Cost and sustainability

4. Selection and Evaluation of Floor Type (20%)

  • Evaluate and discuss the floor type you plan to use for the first floor of the development.
  • Provide a comparison with other floor types and explain your selection based on:
    • Load-bearing capacity
    • Cost-effectiveness
    • Thermal and acoustic properties
    • Construction efficiency

5. Construction Sequence (10%)

  • Based on your responses from Points 1–4, outline a detailed construction sequence for the proposed development after obtaining a building permit.
  • The sequence should clearly present the step-by-step stages of construction from site preparation to project completion.

6. Sustainable Material Selection (10%)

  • Identify and discuss at least three (3) sustainable materials that could be implemented in the proposed project.
  • For each material, provide:
    • Advantages
    • Disadvantages
    • Challenges associated with their adoption in construction projects.
  • Examples may include recycled concrete, cross-laminated timber (CLT), or green insulation materials.

Additional Instructions

  • Form a group of 2 to 3 members.
  • Prepare a 5-minute group presentation summarizing your report findings in Week 12.
  • The report must be clear, concise, and logically structured.
  • Avoid contradictions or inconsistent arguments—these will result in negative marking.

Report Formatting Guidelines

  • Use a formal academic writing style.
  • Include appropriate headings and subheadings for each section.
  • Use Times New Roman or Calibri (12 pt) font and 1.5 line spacing.
  • Include page numbers and student names in the footer.
  • Cite all references using the Harvard Referencing Style.

Assessment Summary

The CSM80011 – Assignment 2 (Semester 2, 2025) required students to develop a detailed technical report for a proposed development project at 18 Patterson Street, Carnegie. Acting as the project’s main stakeholders, students were provided with preliminary town-planning drawings and the survey plan of the existing building.

The purpose of this assessment was to apply theoretical and practical construction knowledge to a real-world scenario by evaluating planning documentation, selecting appropriate construction systems, and proposing sustainable materials.

The report needed to address six major components:

  1. Evaluation of Town-Planning Drawings and Building Classification (10%)
    • Assess drawings and determine building class per the National Construction Code (NCC).
    • Identify and list multiple building classifications if applicable.
  2. Evaluation of Footing Systems (25%)
    • Examine footing systems discussed in lectures.
    • Assess applicability and suitability for the site using soil and level data.
  3. Selection and Evaluation of Wall Type (25%)
    • Choose a preferred wall type and justify selection based on structural, thermal, acoustic, cost, and sustainability factors.
  4. Selection and Evaluation of Floor Type (20%)
    • Evaluate suitable flooring options for the first floor.
    • Compare structural capacity, cost, thermal performance, and construction efficiency.
  5. Construction Sequence (10%)
    • Develop a step-by-step construction sequence from site preparation to completion once the building permit is obtained.
  6. Sustainable Material Selection (10%)
    • Identify three sustainable materials (e.g., recycled concrete, CLT, or green insulation).
    • Discuss their advantages, disadvantages, and implementation challenges.

Additional requirements included forming groups of 2–3 members, preparing a 5-minute presentation in Week 12, and ensuring clarity, conciseness, and logical structure in the report using Harvard referencing.

adminQuest Academic Writer & Editor
WhatsApp